Slogan - Slogan
Picture Gallery

The construction of the individually designed houses took place in factory for most parts and was delivered to the building site. This is how we reduced the waste to almost zero. The components are being delivered completely equipped, hence no plumbing, wiring and other waste. Only the positioning and part of the external finishes are done on site. The use of SIPs, heating with heat recovery, solar panels and air to water pumps make the beautifully designed houses most energy efficient and, thus, affordable to maintain. With the addition of ÜserHuus BIPV, they can even produce energy (for example for community heating), and fit into the architectural environment. 




Tigh Grian House Design:   The Resource Efficient House!SIP pods being built in factory environmentTrucks deliver pods on siteAssembly on site
REH at Official OpeningView from Lounge in the REHRobert Cowie and Margaret Burgess at WHHA event in ObanView from REH's balcony
View of REH from BRE Visitor CentreDesign for Alva CouncilDesign of BRE Watford houses by DRMSite in Watford
FactoryUnits brought by lorryUnits being craned into placeUnits being craned into place
All 5 units in placeHouses nearly finishedOfficial launch with Richard Harrington MP Watford September 11, 2015Pods being assembled at Alva site
Aerial view Street viewInside viewAerial view
Kevin Stuart, Minister for local government and housing at the official inaugurationJacqueline Schindler, director JR Partners Ltd, at the official inaugurationTigh Grian/ÜserHuus at BRE, WatfordRobert and Jacqueline (JR Partners) at Alva Development